3 Crown Heading Excavation For crown heading excavation, the bench and invert excavation is only started after the excavation of the tunnel crown Fig.
Double-shell tunnel cross section.
With the similar model test, Yang et al.
5 m high, and 113.
01 total 90 total 0.
Figure 4.